| 전자부품 데이터시트 검색엔진 |
|
A22Z-R25 데이터시트(PDF) 11 Page - Omron Electronics LLC |
|
|
|||||||||||||||||||||||||||||
A22Z-R25 데이터시트(HTML) 11 Page - Omron Electronics LLC |
|
11 / 52 page ![]() A22NE-PD 11 Removing the Switch Unit Installing the LED Lamp (Lighted Models) When the Switch Unit is to be Removed Slowly push the release port (concave part) of the lock lever with a screwdriver to release the lock. The lock lever moves to the release position. When the lock lever is at the released position in this Switch, the NO and NC contact operation is reversed. Set the lock lever to the locked position when using the Switch. Locked position Release position Lock lever concave part <Lock lever position> When the LED Lamp is to be Installed Insert the protrusions on the LED Lamp into the guides on the Switch Unit in direction (1), and then turn the LED Lamp in direction (2) to lock it in place. 2 1 |
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |