| 전자부품 데이터시트 검색엔진 |
|
OTP16BA3M 데이터시트(PDF) 14 Page - ABB |
|
|
|||||||||||||||||||||||||||||
OTP16BA3M 데이터시트(HTML) 14 Page - ABB |
|
14 / 20 page ![]() 14 Enclosed Switching Products 0115 ABB Low Voltage 15 Enclosed Switching Products 0115 ABB Low Voltage Functionality OTM_C3D OTM_C8D 1. Automatic transfer switch products overview 1.1. Automatic control unit OMD300 OMD800 1.1. Manual operation with handle X X 1.2. Local operation with front panel keypad X X 1.3. Automatic transfer switching equipment (ATSE) X X 1.4. Dual power source for the motor operator 1) X O 2. Measurements 2.1. Three phase voltage measurement on LINE1 X X 2.2. Single phase voltage measurement on LINE1 X X 2.3. Three phase voltage measurement on LINE2 X X 2.4. Single phase voltage measurement on LINE2 X X 2.5. Frequency on LINE1 X X 2.6. Frequency on LINE2 X X 2.7. Possibility to check measurements on LCD X 3. Source failure detections 3.1. No voltage X X 3.2. Undervoltage X X 3.3. Overvoltage X X 3.4. Phase missing X X 3.5. Voltage unbalance X X 3.6. Invalid frequency X X 3.7. Incorrect phase sequence X 4. Configuration 4.1. By DIP switches X 4.2. By rotary switches X 4.3. By keypad and LCD X 4.4. Voltage threshold setting X X 4.5. Voltage hysteresis setting X 4.6. Frequency threshold setting X 4.7. Frequency hysteresis setting X 5. Time delays 5.1. Switching delay X 2) X 5.2. Delay on transfer 3) X 5.3. Dead band time I-II (stop switching to position O) X 5.4. Back-switching delay X 4) X 5.5. Dead band time II-I (stop switching to position O) X 5.6. Generator stop delay X 5) X 5.7. Status of time delays on the LCD X In the enclosed ATS the dual power source is included Comments 1) Dual power source allows the motor operator to be supplied by two separate voltage supplies. This way the motor operator is always energized. 2) Four options: 0, 5, 10 or 30 seconds. 3) Delaying the switching sequence before transferring to generator, guaranteeing that in cold locations the generator is properly heated up. 4) Two options: the duration of back-switching delay is the same as switching delay, i.e. the time delay is same for I - II and II - I, or the back-switching delay is fixed 300 seconds. 5) Two options: the duration of generator stop delay is the same as Switching delay or fixed 5 min. 6) Menus available in eight languages; English, French, German, Italian, Spanish, Russian, Chinese and Finnish. 7) Two-way communication, bus communication protocol is Modbus 8) In case of source failure, the controller can be supplied with an external auxiliary supply with 24…110 V DC. 9) Automatic control unit requires an external signal before allowing the transfer to secondary. 10) Two options for the operating mode after receiving the alarm: control unit either works normally, or initiates generator stop with operation to position O. 11) Two options: No line priority, or Source 1 is the priority source. 12) Three options: No line priority, Source 1 or Source 2 is the priority source. 13) Automatic back-switching to primary source is prevented. 14) Automatic control unit and motor operator must be energized. X = includes as standard O = as an accessory Enclosed automatic transfer switches Controllers technical specification |
|
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |