전자부품 데이터시트 검색엔진
  Korean  ▼
ALLDATASHEET.CO.KR

X  

CTJ2QLP 데이터시트(PDF) 3 Page - Clarke International

부품명 CTJ2QLP
상세설명  2 TONNE GARAGE JACK
PDF  16 Pages
Scroll/Zoom Zoom In 100%  Zoom Out
제조업체  CLARKE [Clarke International]
홈페이지  https://www.clarkeinternational.com/
Logo CLARKE - Clarke International

CTJ2QLP 데이터시트(HTML) 3 Page - Clarke International

  CTJ2QLP Datasheet HTML 1Page - Clarke International CTJ2QLP Datasheet HTML 2Page - Clarke International CTJ2QLP Datasheet HTML 3Page - Clarke International CTJ2QLP Datasheet HTML 4Page - Clarke International CTJ2QLP Datasheet HTML 5Page - Clarke International CTJ2QLP Datasheet HTML 6Page - Clarke International CTJ2QLP Datasheet HTML 7Page - Clarke International CTJ2QLP Datasheet HTML 8Page - Clarke International CTJ2QLP Datasheet HTML 9Page - Clarke International Next Button
Zoom Inzoom in Zoom Outzoom out
 3 / 16 page
background image
3
SAFETY PRECAUTIONS
1. This jack is for lifting only, do not move a load using the jack as a dolly.
2. Do not use to lift people.
3. Always inspect the jack before use. Make sure that all parts are in good
condition and operating smoothly, and that no cracks or distortion is
apparent. If in doubt do not use. Have the damaged parts replaced or
consult your CLARKE dealer.
4. Make sure that the jack is on a firm, solid, level base, and that there is no
possibility of it slipping when under load.
5. Make sure the load is taken by the full saddle and that the point of lift on
the load, is strong enough to support the load adequately.
6. Do not work under the raised vehicle until it is supported by suitable means
e.g. axle stands, NEVER rely on the jack to support the vehicle by itself.
7. Never push a load off the jack.
8. Ensure that all personnel are well clear of a load being raised or lowered.
9. Do not try to lift more than the rated load for the jack, (See “Specifications”
on page 2.)
10. Do not use the jack if an oil leak is apparent. Consult your Clarke dealer.
11. Consult the vehicle handbook to determine the correct lifting points.
12. It is necessary that the operator watch the jack and the load during
operation.
13. Check the condition of the labels regularly and replace as required.
14. The jack must be maintained and repaired in accordance with the these
instructions and such work be carried out by qualified persons.
15. Do not make any adjustments to any valves on the jack.
WARNING: THE OPERATOR MUST FOLLOW ALL INSTRUCTIONS WITHIN THIS
INSTRUCTION BOOKLET



Html Pages

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16


데이터시트 다운로드

Go To PDF Page


링크 URL



ALLDATASHEET 가 귀하에 도움이 되셨나요?  [ DONATE ] 

Alldatasheet는?   |   광고문의   |   운영자에게 연락하기   |   개인정보취급방침   |   링크 투 데이터시트    |   링크교환   |   제조사별 검색
All Rights Reserved©Alldatasheet.com


Mirror Sites
English : Alldatasheet.com  |   English : Alldatasheet.net  |   Chinese : Alldatasheetcn.com  |   German : Alldatasheetde.com  |   Japanese : Alldatasheet.jp
Russian : Alldatasheetru.com  |   Korean : Alldatasheet.co.kr  |   Spanish : Alldatasheet.es  |   French : Alldatasheet.fr  |   Italian : Alldatasheetit.com
Portuguese : Alldatasheetpt.com  |   Polish : Alldatasheet.pl  |   Vietnamese : Alldatasheet.vn
Indian : Alldatasheet.in  |   Mexican : Alldatasheet.com.mx  |   British : Alldatasheet.co.uk  |   New Zealand : Alldatasheet.co.nz
Family Site : ic2ic.com  |   icmetro.com