| 전자부품 데이터시트 검색엔진 |
|
LT1952IGN-1TRPBF 데이터시트(PDF) 18 Page - Linear Technology |
|
|
|||||||||||||||||||||||||||||
LT1952IGN-1TRPBF 데이터시트(HTML) 18 Page - Linear Technology |
|
18 / 24 page ![]() LT1952/LT1952-1 18 19521fd VSS(t) = SS_MAXDC(DC) (1 – e(–t/RC)) to give: t = RC • (–1) • ln(1 – VSS/SS_MAXDC(DC)) where: VSS = SS_MAXDC voltage at time t SS_MAXDC(DC) = programmed DC voltage setting maximum duty cycle clamp = VREF(RB/(RT + RB) R = RCHARGE (Figure 11) = RT • RB/(RT + RB) C = CSS (Figure 11) Example (1) No Switching Period Theperiodofnoswitchingfortheconverter,whenasoft-start event has occurred, depends on how far SS_MAXDC can fall before recharging occurs and how long a fault exists. It will be assumed that a fault triggering soft-start is removed before SS_MAXDC can reach its reset threshold (0.45V). No Switching Period = tDISCHARGE + tCHARGE tDISCHARGE = discharge time from SS_MAXDC(DC) to 0.45V tCHARGE = charge time from 0.45V to VSS(ACTIVE) tDISCHARGE was already calculated earlier as 185μs. tCHARGE is calculated by assuming the following: VREF = 2.5V, RT = 35.7k, RB = 100k, CSS = 0.1μF and VSS(MIN) = 0.45V. tCHARGE = t(VSS = 0.8V) – t(VSS = 0.45V) Step 1: SS_MAXDC(DC) = 2.5[100k/(35.7k + 100k)] = 1.84V RCHARGE = (35.7k • 100k/135.7k) = 26.3k Step 2: t(VSS = 0.45V) is calculated from, t = RCHARGE • CSS • (–1) • ln(1 – VSS/SS_MAXDC(DC)) = 2.63e4 • 1e–7 • (–1) • ln(1 – 0.45/1.84) = 2.63e–3 • (–1) • ln(0.755) = 7.3e–4 s APPLICATIONS INFORMATION Step 3: t(VSS = 0.8V) is calculated from: t = RCHARGE • CSS • (–1) • ln(1 – VSS/SS_MAXDC(DC)) = 2.63e4 • 1e–7 • (–1) • ln(1 – 0.8/1.84) = 2.63e–3 • (–1) • ln(0.565) = 1.5e–3 s From Step 1 and Step 2: tCHARGE = (1.5 – 0.73)e–3 s = 7.7e–4 s The total time of no switching for the converter due to a soft-start event: = tDISCHARGE + tCHARGE = 1.85e–4 + 7.7e–4 = 9.55e–4 s Example (2) Converter Output Rise Time The rise time for the converter output to reach regulation can be closely approximated as the time between the start of switching (SS_MAXDC = VSS(ACTIVE))andthetimewhere converter duty cycle is in regulation (DC(REG)) and no longer controlled by SS_MAXDC (SS_MAXDC = VSS(REG)). Converter output rise time can be expressed as: Output Rise Time = t(VSS(REG)) – t(VSS(ACTIVE)) Step 1: Determine converter duty cycle DC(REG) for output in regulation. The natural duty cycle DC(REG) of the converter depends on several factors. For this example it is assumed that DC(REG) = 60% for system input voltage near the undervoltage lockout threshold (UVLO). This gives SD_VSEC = 1.32V. Also assume that the maximum duty cycle clamp programmed for this condition is 72% for SS_MAXDC(DC) = 1.84V, fOSC = 200kHz and RDELAY = 40k. Step 2: Calculate VSS(REG) TocalculatethelevelofSS_MAXDC(VSS(REG))thatnolonger clamps the natural duty cycle of the converter, the equation for maximum duty cycle clamp must be used (see previous section ‘Programming Maximum Duty Cycle Clamp’). The point where the maximum duty cycle clamp meets DC(REG) during soft-start is given by: DC(REG) = Max Duty Cycle clamp 0.6 = k • 0.522(SS_MAXDC(DC)/SD_VSEC) – (tDELAY • fOSC) |
|
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |