| 전자부품 데이터시트 검색엔진 |
|
AN4345 데이터시트(PDF) 24 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
AN4345 데이터시트(HTML) 24 Page - STMicroelectronics |
|
24 / 28 page ![]() Test equipment and measurement of efficiency and light load performance AN4345 24/28 DocID025078 Rev 1 Figure 38. Switch in position 1-setting for standby measurements In case of high UUT input current (i.e. for measurements in heavy load conditions), the voltage drop can be relevant compared to the UUT real input voltage. If this is the case, the switch in Figure 37 can be changed to position 2 (see simplified scheme of Figure 39) where the UUT input voltage is measured directly at the UUT input terminal and the input current does not affect the measured input voltage. Figure 39. Switch in position 2-setting for efficiency measurements On the other hand, the position of Figure 39 may introduce a relevant error during light load measurements, when the UUT input current is low and the leakage current inside the voltmeter itself (which is not an ideal instrument and doesn't have infinite input resistance) is not negligible. This is the reason why it is better to use the setting of Figure 38 for light load measurements and Figure 39 for heavy load measurements. AM13844V1 V + - A ~ AC SOURCE UUT U.U.T. AC INPUT Voltmeter Ammeter Wattmeter AM13845V1 V + - ~ AC SOURCE UUT U.U.T. AC INPUT Voltmeter Ammeter A Wattmeter |
|
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |