| 전자부품 데이터시트 검색엔진 |
|
MB39C601 데이터시트(PDF) 19 Page - Cypress Semiconductor |
|
|
|||||||||||||||||||||||||||||
MB39C601 데이터시트(HTML) 19 Page - Cypress Semiconductor |
|
19 / 37 page ![]() Document Number: 002-08393 Rev.*A Page 19 of 37 MB39C601 8.9 TZE Part MB39C601 requires all of the following three conditions in order to start the next switching cycle. 1. The time since the last turn-on edge must be equal to or longer than the switching time set by IFB. 2. The time since the last turn-on edge must be longer than the minimum switching period set by MB39C601 (nominally 7.5µs which equals 133 kHz). 3. Immediately after zero energy detection at the TZE pin. Or, the time since the last zero energy detection must be longer than tWAIT, (TZE) (2.4μs or less). Starting switching cycle diagram The TZE pin is connected with Auxiliary Winding of the transformer through the resistance division, and detects zero energy as shown "TZE pin Connection". A delay, 50ns to 200ns, can be added with CTZE to adjust the turn-on of the primary switch with the resonant bottom of Primarty Winding waveform. Switching Waveform at detecting zero Energy |
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |