| 전자부품 데이터시트 검색엔진 |
|
P4802ACMC 데이터시트(PDF) 152 Page - Teccor Electronics |
|
|
|||||||||||||||||||||||||||||
P4802ACMC 데이터시트(HTML) 152 Page - Teccor Electronics |
|
152 / 212 page ![]() UL 497A http://www.teccor.com 4 - 28 © 2002 Teccor Electronics +1 972-580-7777 SIDACtor® Data Book and Design Guide Performance Tests The following key performance tests relate to overvoltage protection of the secondary protectors: 1. Impulse Voltage Measurement Test — Secondary protectors must break down within ±25% of the manufacturer’s breakdown rating when tested in each polarity with a rate of voltage rise of 100 V/µs, ±10%. Note that the manufacturer may assign separate breakdown voltage ratings for the Breakdown Voltage Measurement Test. This requirement only applies to secondary protectors that connect between Tip and Ring of the telephone loop. 2. Breakdown Voltage Measurement Test — Secondary protectors must break down within ±25% of the manufacturer’s breakdown rating when tested in each polarity with a rate of voltage rise no greater than 2000 V/s. The secondary protector is to be mounted in accordance with the manufacturer’s installation instructions and then subjected to the test circuit shown in Figure 4.10. This requirement applies only to secondary protectors connected between Tip and Ring or Tip/Ring and Ground of the telephone loop. 3. Overvoltage Test — Secondary protectors must limit current and extinguish or open the telephone loop without loss of its overvoltage protector, indication of fire risk, or electric shock. Upon completion of this test, samples must comply with the Dielectric Voltage- withstand Test. The overvoltage test is used to determine the effects on secondary protectors and is shown in Table 4.18. Test connections are shown in Figure 4.11. Test Compliance Compliance with the overvoltage test is determined by meeting the following criteria: • Cheesecloth indicator may not be either charred or ignited • Wiring simulator (1.6 A Type MDQ fuse or 26 AWG line cord) may not be interrupted • Protector meets the applicable dielectric voltage withstand requirements after the completion of the overvoltage tests Notes: 1. Apply Tests L1, L2, and L5 between Tip and Ground or Ring and Ground. 2. Apply Tests L3 and L4 simultaneously from both Tip and Ring to Ground. Table 4.18 UL 497A Overvoltage Test Test Voltage (VRMS) Current (A) Time Connection L1 600 40 1.5 s (Note 1, Figure 4.11) L2 600 7 5 s (Note 1, Figure 4.11) L3 600 2.2, 1, 0.5, 0.25 30 min at each current level (Note 2, Figure 4.11) L4 200 V rms or just below the breakdown voltage of the overvoltage protection device 2.2 A or just below the interrupt value of the current interrupting device 30 min (Note 2, Figure 4.11) L5 240 24 30 min (Note 1, Figure 4.11) |
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |