전자부품 데이터시트 검색엔진
  Korean  ▼
ALLDATASHEET.CO.KR

X  

AN2808 데이터시트(PDF) 17 Page - STMicroelectronics

부품명 AN2808
상세설명  The PM6670S device is a complete
PDF  40 Pages
Scroll/Zoom Zoom In 100%  Zoom Out
제조업체  STMICROELECTRONICS [STMicroelectronics]
홈페이지  http://www.st.com
Logo STMICROELECTRONICS - STMicroelectronics

AN2808 데이터시트(HTML) 17 Page - STMicroelectronics

Back Button AN2808 Datasheet HTML 13Page - STMicroelectronics AN2808 Datasheet HTML 14Page - STMicroelectronics AN2808 Datasheet HTML 15Page - STMicroelectronics AN2808 Datasheet HTML 16Page - STMicroelectronics AN2808 Datasheet HTML 17Page - STMicroelectronics AN2808 Datasheet HTML 18Page - STMicroelectronics AN2808 Datasheet HTML 19Page - STMicroelectronics AN2808 Datasheet HTML 20Page - STMicroelectronics AN2808 Datasheet HTML 21Page - STMicroelectronics Next Button
Zoom Inzoom in Zoom Outzoom out
 17 / 40 page
background image
AN2808
Getting started
17/40
9
Getting started
The following step-by-step power-up and power-down sequences are provided in order to
correctly evaluate the performance of the PM6670S board.
9.1
Power-up sequence
Working in an ESD-protected environment is highly recommended. Check all wrist straps
and mat earth connections before handling the PM6670S board. Connect the power
supplies as shown in the PM6670S test setup (Figure 14) and insert the meters in order to
perform the desired performance evaluation. Connect the scope probes as desired.
1.
Set the JP1, JP2, JP3 and JP5 jumpers in order to properly configure the PM6670S
board.
2.
Set the S3-S5 switches to the ON (upper) position. Do not change the jumper settings
when the board is powered.
3.
Set the VCC supply to 5 V ± 5% and the current limit to 100 mA.
4.
Set the VIN supply to a voltage in the range of 4.5 to 28 V. An initial test at 12 V and 3 A
current limit is suggested.
5.
Set all the loads to 0 A.
6.
Turn on the VIN supply.
7.
Turn on the VCC supply.
8.
Vary the VDDQ load from 0 A to 10 A.
9.
Vary the VTT load from 0 A to 2 A to test the source capability. To test the sink
capability use the dashed VTT load shown in Figure 14.
10. Vary the VTTREF load to test the source capability.
11. Vary the VIN supply from 4.5 to 28 V.
9.2
Power-down sequence
1.
Decrease the VTTREF and VTT loads to 0 A.
2.
Reduce the VDDQ load to 5 A.
3.
Decrease the VCC supply from 5 to 3.8 V in order to test the UVLO.
4.
Increase the VCC supply from 3.8 to 5 V to restart the device.
5.
Use the S3-S5 switches to enter/exit the S0-S3-S5 states.
6.
Turn off the VDDQ load.
7.
Turn off the VCC supply.
8.
Turn off the VIN supply.



Html Pages

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40


데이터시트 다운로드

Go To PDF Page


링크 URL



ALLDATASHEET 가 귀하에 도움이 되셨나요?  [ DONATE ] 

Alldatasheet는?   |   광고문의   |   운영자에게 연락하기   |   개인정보취급방침   |   링크 투 데이터시트    |   링크교환   |   제조사별 검색
All Rights Reserved©Alldatasheet.com


Mirror Sites
English : Alldatasheet.com  |   English : Alldatasheet.net  |   Chinese : Alldatasheetcn.com  |   German : Alldatasheetde.com  |   Japanese : Alldatasheet.jp
Russian : Alldatasheetru.com  |   Korean : Alldatasheet.co.kr  |   Spanish : Alldatasheet.es  |   French : Alldatasheet.fr  |   Italian : Alldatasheetit.com
Portuguese : Alldatasheetpt.com  |   Polish : Alldatasheet.pl  |   Vietnamese : Alldatasheet.vn
Indian : Alldatasheet.in  |   Mexican : Alldatasheet.com.mx  |   British : Alldatasheet.co.uk  |   New Zealand : Alldatasheet.co.nz
Family Site : ic2ic.com  |   icmetro.com