| 전자부품 데이터시트 검색엔진 |
|
HTX 데이터시트(PDF) 9 Page - RMT Ltd. |
|
|
|||||||||||||||||||||||||||||
HTX 데이터시트(HTML) 9 Page - RMT Ltd. |
|
9 / 36 page ![]() OPERATING MANUAL. HTX SERIES Page 9 of 36 3.2 Preparations for working You need to procure the following for working with the Sensors: - Mounting substance (i.e. tape, paste, or glue) to mount the Sensor in your setup. - Read-out device (i.e. RMT DX8140 Datalogger, millivoltmeter, ohmmeter), or third party read-out device. Note that the read-out device must have passive input for Sensor and active input for working with Pt1000 thermistor. - Device for Sensor self-calibration procedure. If RMT DX8140 Datalogger is procured, the procedure is available. Otherwise any model of RMT Z-meters is suitable for that. 3.3 Sensor testing Before mounting the Sensor must be tested as described in Chapter 6. 3.4 Sensor calibration If necessary, or required for an application the Sensor can be calibrated by the self-calibration procedure described in Chapter 10. 3.5 Mounting of the Sensor Ensure that the mounting surface is flat, dry, and free of dust and grease. Clean the Sensor surface with ethanol or isopropanol. Do not use acids or alkali for cleaning the Sensor. Mount the Sensor using a mounting substance. A detailed description of the Sensor mounting is given in Chapter 6. The common mounting scheme is advised in Fig. 4.1 |
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |