| 전자부품 데이터시트 검색엔진 |
|
705-5100-F21 데이터시트(PDF) 16 Page - Magnetrol International, Inc. |
|
|
|||||||||||||||||||||||||||||
705-5100-F21 데이터시트(HTML) 16 Page - Magnetrol International, Inc. |
|
16 / 52 page ![]() 16 57-645 Eclipse Guided Wave Radar Transmitter - PROFIBUS PA™ 2. Ratio of Diameter: Length (A:B) is 1:1 or greater; any ratio <1:1 (e.g., a 2" × 6" nozzle = 1:3) may require a Blocking Distance and/or DIELECTRIC adjustment 3. No pipe reducers (restrictions) are used. • Probe is kept away from conductive objects to ensure proper performance. See Probe Clearance Table below. A lower gain (increase in DIELECTRIC setting) may be necessary to ignore certain objects. 3.4.3.1 To install a Model 7xF rigid single rod probe: x Make sure the process connection is at least 2" NPT or a flanged mounting. y Carefully place the probe into the vessel. Align the gasket on flanged installations. z Align the probe process connection with the threaded or flanged mounting on the vessel. { For threaded connections, tighten the hex nut of the probe process connection. For flanged connections, tighten flange bolts. | Probe can be stabilized by placing into a non-metallic cup or bracket at the bottom of the probe. A TFE bottom spacer (P/N 89-9114-001) is optional for mounting into a metallic cup or bracket. NOTE: If the transmitter is to be installed at a later time, do not remove the protective cap from the probe. Do not use sealing com- pound or TFE tape on probe connection to transmitter as this connection is sealed by a Viton® O-ring. 3.4.3.2 To install a Model 7x1 flexible single rod probe: x Make sure the process connection is at least 2" NPT or a flanged mounting. y Carefully place the probe into the vessel. Align the gasket on flanged installations. Distance to Probe Acceptable Objects <6" Continuous, smooth, parallel conductive surface, for example a metal tank wall; important that probe does not touch wall >6" <1" (25mm) diameter pipe and beams, ladder rungs >12" <3" (75mm) diameter pipe and beams, concrete walls >18" All remaining objects PROBE CLEARANCE GUIDELINES A B x y z { | |
|
링크 URL |
| ALLDATASHEET 가 귀하에 도움이 되셨나요? [ DONATE ] |
Alldatasheet는? | 광고문의 | 운영자에게 연락하기 | 개인정보취급방침 | 링크 투 데이터시트 | 링크교환 | 제조사별 검색 All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |